Strategy for Prioritization of Storage Hydropower Projects - A Case from Nepal
Main Article Content
Abstract
Purpose: This research aims to analyze the Sensitivity for Prioritization of Storage Hydropower Projects of Nepal.
Design/Methodology/Approach: Analytical Hierarchy Process (AHP) based on Multi-Criteria Decision Making (MCDM) has been used for analyzing the Technical, Financial, Policy, Environment factors Sensitivity with pairwise comparison in different multiple criteria. Additionally, the response from the client and expert opinion was conducted.
Findings/Result: Technical on first (weightage of 34%), financial on the second (weightage of 25%), environmental on third (weightage of 16%), policy and political on fourth (weightage of 11%), uncertainties on fifth (weightage of 9%), and respondents on sixth (weightage of 5%) are the main the factors. The impact can be explained at 50 % change in weight of respondent Nalsaugad Storage Hydropower Project stands at first rank. If the weightage of respondents changes by 100% then Uttarganga Storage Hydropower Project stands at first rank with respect to respondent factor. The sensitivity analysis with respect to factors was done, which shows no significant difference in the ranking of projects at the base case and at the case of change in weight of factors.
Originality/Value: It is action research to assure factors weights
Paper Type: Analytical Policy Research
Downloads
Article Details
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.