Strategy for Prioritization of Storage Hydropower Projects - A Case from Nepal

Main Article Content

Surendra Kaini
Anjay Kumar Mishra
Rajesh Sapkota
Aithal P. S.

Abstract

Purpose: This research aims to analyze the Sensitivity for Prioritization of Storage Hydropower Projects of Nepal.


Design/Methodology/Approach: Analytical Hierarchy Process (AHP) based on Multi-Criteria Decision Making (MCDM) has been used for analyzing the Technical, Financial, Policy, Environment factors Sensitivity with pairwise comparison in different multiple criteria. Additionally, the response from the client and expert opinion was conducted.


Findings/Result: Technical on first (weightage of 34%), financial on the second (weightage of 25%), environmental on third (weightage of 16%), policy and political on fourth (weightage of 11%), uncertainties on fifth (weightage of 9%), and respondents on sixth (weightage of 5%) are the main the factors. The impact can be explained at 50 % change in weight of respondent Nalsaugad Storage Hydropower Project stands at first rank. If the weightage of respondents changes by 100% then Uttarganga Storage Hydropower Project stands at first rank with respect to respondent factor. The sensitivity analysis with respect to factors was done, which shows no significant difference in the ranking of projects at the base case and at the case of change in weight of factors.


Originality/Value: It is action research to assure factors weights


Paper Type: Analytical Policy Research

Downloads

Download data is not yet available.

Article Details

How to Cite
Surendra Kaini, Anjay Kumar Mishra, Rajesh Sapkota, & Aithal P. S. (2021). Strategy for Prioritization of Storage Hydropower Projects - A Case from Nepal. International Journal of Management, Technology and Social Sciences (IJMTS), 6(2), 28–46. https://doi.org/10.47992/IJMTS.2581.6012.0151
Section
Articles

Most read articles by the same author(s)

<< < 5 6 7 8 9 10